April 2005
The project is to put a new copper fountain on the side of the Chimney in a roof garden/terrace. |
 |
progress on the fountain sculpture

Fountain pan with bearing plate positioned.
fountain pan is 9.1deep, with foot plate the top edge will be @ ~9.6 and the water level in the pan should be @ 8.5" deep. The bearing plate is 3/16 plate copper, spacers to raise the pan and direct the alternate drain flow out over the rock are .25 thick silicon bronze and the pan itself is 1/16 material making the pan base .5 thick. Top of the water should be about 9" above the top of the stone.
|
|

Pan with drain hole established.
|

laser level projection of water line, full
|

laser level projection of water line, with valve open
|

Pan with fish, sculpture base and drain valve approximately in place.
|

Forming and machining the alternate drain valve for the fountain bowl.
|

Pan, with edge broken to finish height and sitting in front of a copper panel the width of the planter it sits if front of.
|

Pan prior to addition of back, setting up to measure for final trim prior to welding on the back plate.
|

Pan bottom with spillways roughed in and showing drain hole for high wind situations.
|
|
Strangis Fountain project main page - Index of Jobs
|